The Adrian District Library moved into its current location in 1978. The restrooms on the main floor and the children’s mezzanine date from that time, and show their age. In addition to worn-out partitions and finishes, the restrooms are functionally outdated. They do not meet requirements for handicapped accessibility or offer modern amenities like baby-changing stations – in the women’s AND men’s rooms.
Phase 1: Design Development
Black Raven Architects documented the existing conditions, evaluated renovation options, and prepared cost estimates to help the Library determine the best options for renovation.
Phase 2: Schematic Designs
Once a renovation option was selected, 3D models of each bathroom was created showing different material options.
Phase 3: Construction
Construction drawings were created detailing demo and construction work.